- Add GET /calendar/day endpoint with optional ?date= query param
- Returns unified CalendarDayResponse merging real slots + virtual plan slots
- New CalendarSlotItem schema supports both real (id) and virtual (virtual_id) slots
- Excludes inactive slots (skipped/aborted) from results
- All slots sorted by scheduled_at ascending
- Add TimeSlotCreate, TimeSlotResponse, TimeSlotCreateResponse schemas
- Add SlotConflictItem, SlotTypeEnum, EventTypeEnum, SlotStatusEnum to schemas
- Add POST /calendar/slots endpoint with:
- Overlap detection (409 on conflict)
- Workload warning computation (advisory, returned in response)
- Support for event_type + event_data (job/system/entertainment)
- Default date to today if not provided
- Add _slot_to_response helper for ORM -> schema conversion
- Virtual slot ID: plan-{plan_id}-{YYYY-MM-DD} format with parse/make helpers
- Plan-date matching: on_month/on_week/on_day hierarchy with week_of_month calc
- Materialization: convert virtual slot to real TimeSlot row, copy plan template
- Detach: clear plan_id after edit/cancel to break plan association
- Bulk materialization: materialize_all_for_date for daily pre-compute
- 23 tests covering all paths (matching, virtual gen, materialize, detach, bulk)
Decision: retain DB column, mark DEPRECATED. Existing rows still return
feat_task_id via API. New accept flow (BE-PR-007) does not write it.
Clients should migrate to generated_tasks / Task.source_proposal_id.
- Backend: model/schema/router deprecation comments updated
- Backend: added docs/BE-PR-010-feat-task-id-deprecation.md
- Tests: updated to work with Essential-based accept flow
- Tests: all 21 proposal tests pass
- TASKLIST: BE-PR-010 marked complete
- New router: /projects/{project_id}/proposals/{proposal_id}/essentials
- GET (list) - list all essentials under a proposal
- POST (create) - create essential with auto-generated EssentialCode
- GET /{id} - get single essential by id or essential_code
- PATCH /{id} - update essential (title, type, description)
- DELETE /{id} - delete essential
- All mutations restricted to open proposals only
- Permission: creator, project owner, or global admin
- Registered essentials router in main.py
- Updated GET /proposals/{id} to return ProposalDetailResponse with
embedded essentials list
- Activity logging on all CRUD operations
- Add comprehensive docstring to Proposal model documenting all relationships
- Add column comments for all fields (title, description, status, project_id, etc.)
- Mark feat_task_id as DEPRECATED (will be replaced by Essential→task mapping in BE-PR-008)
- Add proposal_code hybrid property as preferred alias for DB column propose_code
- Update ProposalResponse schema to include proposal_code alongside propose_code
- Update serializer to emit both proposal_code and propose_code for backward compat
- No DB migration needed — only Python-level changes
- Backend: new canonical Proposal model + /proposals router
- Backward-compat shims for old Propose imports and /proposes API
- Tests updated to use /proposals, legacy compat tests added
- Impact checklist: docs/BE-PR-001-rename-impact.md
- TASKLIST.md: BE-PR-001 marked complete
All 21 proposal tests pass.
- Mark MVP scope as finalized
- Define release order across submodules
- Document rollback/degradation strategy
- Close CLI contribution note item
- Close repo-config-safe note
- Update submodule refs for Monitor and Plugin
- Mark plugin↔monitor bridge TODO items as complete in cross-project todo
- Sections 4.6, 5.1-5.4, Phase A/E bridge items all done